Installation Steps for Single Girder Bridge Cranes

Introduction

Proper installation of a single girder bridge crane is essential to ensure its safe and efficient operation. Here are the key steps to follow during the installation process.

Site Preparation

1.Assessment and Planning:

Evaluate the installation site to ensure it meets structural requirements. Verify that the building or supporting structure can handle the crane’s load and operational forces.

2.Foundation Preparation:

If necessary, prepare a concrete foundation for the runway beams. Ensure the foundation is level and properly cured before proceeding.

10 ton single girder overhead crane supplier
10 ton single girder overhead crane price

Installation Steps

1.Runway Beam Installation:

Position and align the runway beams along the length of the facility. Secure the beams to the building structure or supporting columns using appropriate mounting hardware.

Ensure the beams are parallel and level, using laser alignment tools or other precise measuring equipment.

2.End Truck Installation:

Attach the end trucks to the ends of the main girder. The end trucks contain wheels that allow the crane to travel along the runway beams.

Securely bolt the end trucks to the main girder and verify their alignment.

3.Main Girder Installation:

Lift the main girder and position it between the runway beams. This step may require the use of temporary supports or additional lifting equipment.

Attach the end trucks to the runway beams, ensuring they roll smoothly along the entire length.

4.Hoist and Trolley Installation:

Install the trolley onto the main girder, ensuring it moves freely along the beam.

Attach the hoist to the trolley, connecting all electrical and mechanical components according to the manufacturer’s instructions.

Electrical Connections

Connect the electrical wiring for the hoist, trolley, and control system. Ensure all connections comply with local electrical codes and the manufacturer’s specifications.

Install control panels, limit switches, and emergency stop buttons in accessible locations.

Final Checks and Testing

Conduct a thorough inspection of the entire installation, checking for tightness of bolts, proper alignment, and secure electrical connections.

Perform load testing to ensure the crane operates correctly under its maximum rated capacity. Test all control functions and safety features.

Conclusion

Following these installation steps ensures that your single girder bridge crane is set up correctly and safely, ready for efficient operation. Proper installation is crucial for the crane’s performance and longevity.