A Single Beam Overhead Crane is a versatile tool that can be used in a variety of industries. Such as manufacturing, warehousing, and construction. Its versatility is due to its ability to lift and move heavy loads over long distances.
There are several steps involved in assembling a Single Girder Bridge Crane. These steps include:
Step 1: Site Preparation
Before assembling the crane, it is essential to prepare the site. This involves ensuring that the area around the crane is level and firm enough to support the crane’s weight. The site should also be free of any obstacles that might interfere with the crane’s movement.
Step 2: Installing the Runway System
The runway system is the structure on which the crane moves. The runway system is typically made up of rails that are mounted on the supporting columns. The rails must be level, straight, and securely attached to the columns.
Step 3: Erecting the Columns
The columns are the vertical supports that hold up the runway system. The columns are typically made of steel and are bolted or welded to the foundation. The columns must be plumb, level, and securely anchored to the foundation.
Step 4: Installing the Bridge Beam
The bridge beam is the horizontal beam that supports the trolley and hoist. The bridge beam is typically made of steel and is attached to the end beams. The end beams are the wheeled assemblies that ride on the runway system. The bridge beam must be leveled and securely attached to the end beams.
Step 5: Installing the Trolley and Hoist
The trolley and hoist are the components that lift and move the load. The trolley rides on the bridge beam, and the hoist is attached to the trolley. The trolley and hoist must be installed according to the manufacturer’s instructions and must be tested before use.
In conclusion, assembling a Single Beam Overhead Crane is a complex process that requires careful planning and execution. Each step must be completed correctly to ensure that the crane is safe and reliable to use. During the installation process, if you encounter problems that are difficult to solve, you can consult our engineers.